🔑cyber-valley/cve/legal/annex h handover condition.md

Annex H — Condition Schedule at Handover

Annexed to land rights agreement. Referred to at §5A.6 item 6, BAST Pengembalian (redelivery): condition on return at Term end is measured against this annex. One Annex H is completed per Plot, at BAST Lahan (site handover, item 1 of the chain) — this page carries the form.

Form

field recorded at note
Photographic record BAST Lahan dated, timestamped, covering every boundary and any existing structure
Inventory BAST Lahan fixtures, existing vegetation of record, any Company infrastructure crossing the Plot (Z4 access, utility runs under Annex F)
Soil baseline BAST Lahan test result under Annex D D3, for comparison against the soil-building requirement over the Term
Boundary state BAST Lahan cross-references Annex B for this Plot
Redelivery condition BAST Pengembalian compared against the baseline above; wear consistent with the permitted use under Annex G is not a defect

What "baseline" means for redelivery

The Holder returns the Plot in the condition this annex records, adjusted for: (a) fair wear from the permitted use over the Term; (b) Improvements the Holder is entitled to leave or is required to remove under the deed's own end-of-term provisions; (c) soil condition, which is expected to have improved under Annex D D3, not merely been preserved. A dispute over redelivery condition is resolved by the independent supervisor under 5A.3, comparing the current state to this annex.

Graph