Rain Day Protocol

Indoor task rotation when outdoor work is paused by weather.


softforce — indoor care and processing

Elona

  • inventory check — review all items in storage and dryer room
  • check what is fully dry — sort and move to processing
  • process dry items and pack — label and store properly

carrot house — ground floor

  • full cleaning sweep of lower level
  • indoor plant care — water, inspect, remove dead leaves

carrot house — upper floor

  • surface cleaning — wipe all horizontal and accessible surfaces

hardforce — laba ops and production

laba — inventory

  • full inventory audit — count, verify, and log all items
  • note anything missing, damaged, or low stock

laba — tools and shelves

  • clean all shelves — remove dust and debris
  • wipe and inspect each tool — return to correct place

production

  • make signs and directional markers — follow current layout plan

All rain-day tasks should be completed before outdoor work resumes. Report inventory findings and any issues to the coordinator at end of shift.

Local Graph