its currently the biggest bottleneck in construction

its heavy, we need it a lot, we need it everywhere

on average electric bike spend 3-4 % of battery to climb 100m by height

we can charge reliably in a very short window: from 10.00 to 14.00

so the process is the following

  • responsible for operation must install motorbike on charging at 10.00
  • in 14.00 he must start delivery
    • register % of charging
  • once the bettery is drained the bike must be returned to charger
    • not connect to charger until next morning, energy at night is limited
    • work done must be registered and remaining power, if its there

never stop this process